2019-1 |
TBD |
Westgate CRA/Palm Beach County |
Seminole Blvd
from Okeechobee Blvd to Oswego Ave |
Construct 12 ft shared use paths, high visibility crosswalks, and pedestrian lighting |
FY 2023 |
$1M |
$1.67M |
 |
|
2019-2 |
TBD |
City of Boynton Beach |
SE 1st St. from Boynton Beach Blvd to Woolbright Rd |
Construct 10 ft shared use path on western side of roadway |
FY 2023 |
$1M |
$3.3M |
 |
|
2019-3 |
TBD |
Town of Loxahatchee Groves |
Okeechobee Blvd
from A Rd to Folsom Rd |
Construct 6 ft multi-use trail with fence on south side of roadway |
FY 2023 |
$886K |
$1.38M |
 |
|
2019-4 |
TBD |
City of Palm Beach Gardens |
Various existing pedestrian crossings along Holly Drive |
Install pedestrian activated flashers at 12 existing crossings |
FY 2023 |
$336K |
$397K |
 |
|
2019-5 |
TBD |
Village of Royal Palm
Beach |
Multiple Locations throughout Village |
Construct wayfinding kiosks and shelters with bicycle & pedestrian amenities |
FY 2023 |
TBD |
$728K |
 |
|
2018-1
|
4443501
|
City of West Palm Beach
|
Clear Lake Trail North (Phase 1) (NW side of Clear Lake from
Okeechobee Blvd to Palm Beach Lakes Blvd) |
Construct 10 ft shared Use Path on west side of Clear Lake in West Palm Beach.
|
FY 2022
|
$997K |
$1.8M
|
 |
|
2018-2 |
4443591 |
City of Greenacres |
Dillman Trail (Forest Hill Blvd to Dillman Rd) |
Construct 12 ft shared use path |
FY 2022 |
$561K |
$728K |
 |
|
2018-3
|
4443671
|
Palm Beach County (Westgate CRA)
|
Bridgeman Dr, Wellington Rd, Prairie Rd (Phase 2) |
Install 5 ft sidewalks and pedestrian scale lighting |
FY 2022 |
$1.19M |
$1.50M
|
 |
|
2018-4
|
4443661
|
Palm Beach County
|
A1A/Ocean Dr. (Between Donald Ross Rd and Indiantown Rd) |
Pedestrian Crossing Enhancements |
FY 2022 |
$774K |
$848K |
 |
|
2017-1
|
4415271
|
City of West Palm Beach
|
Northmore neighborhood
|
Construct sidewalks and shared use path
|
FY 2022 |
$1.21M |
$1.23M |
 |
|
2017-2
|
4415301 |
Palm Beach County (Westgate CRA)
|
Belvedere Heights neighborhood
|
Install streetlights and sidewalks
|
Construction began on 1/23/19. Anticipated Completion Date is August 2020 |
$1.11M |
$1.48M |
 |
|
2017-4
|
4415311 |
Village of Royal Palm Beach
|
FPL Pathway (Lamstein Ln to Las Palmas St)
|
Install LED lighting adjacent to FPL pathway
|
Anticipated Construction Completion Date is April 2022
|
$1.17M |
$1.17M |
 |
|
N/A |
4416321 |
FDOT |
Lake Worth Rd (Raulerson Dr to Palm Beach State College Entrance) |
Resurface roadway and multi-modal improvements |
FY 2022 |
$0 |
$4.31M |
 |
|
2016-1
|
4400141 |
Village of Wellington
|
Aero Club Dr (Greenbriar Blvd to Binks Forest Dr)
|
Bicycle improvements-Including bicycle lanes
|
Anticipated Construction Start: September 2020
|
$766K |
$817K
|
 |
|
2016-2
|
4400151 |
City of West Palm Beach
|
North Shore Pedestrian Bridge (between 39th St. and 43rd St.)
|
Construct new pedestrian bridge parallel to existing North Shore Dr. bridge on the west side.
|
Anticipated Construction Start: September 2024
|
$1.20M |
$1.05M
|
 |
|
2016-3
|
4400121 |
City of West Palm Beach
|
Roosevelt Estates neighborhood
|
Install ADA ramp improvements and crosswalks with texturized pavement
|
FY 2020
|
$905K |
$782K
|
 |
|
2016-4
|
4400171 |
City of Delray Beach
|
Various Alleyway locations running parallel to 4th and 5th Avenues (SW 10th St. to SW 3rd St.)
|
Pave and landscape downtown alleyways
|
FY 2020
|
$2.57M |
$643K
|
 |
|
2015-1
|
4382891 |
City of Delray Beach
|
Seacrest Blvd (NE 22nd St to Gulfstream Blvd)
|
Add green bike lanes, wider sidewalks, brick crosswalks and school zone lighting
|
Anticipated Construction Completion Date is July 2020
|
$1.74M |
$2.34M
|
 |
|
2015-2
|
4287181
|
Village of Tequesta
|
US1 (Beach Rd to Martin County Line)
|
Add buffered bike lanes, street trees and signage |
Construction Completed in 2018
|
$1.70M |
$1.36M
|
 |
 |
2015-3
|
4383061 |
Village of Wellington
|
Binks Pointe Pathway (Binks Forest Dr to Flying Cow Rd)
|
Construct shared use pathway to connect Binks Pointe area to Wellington Environmental Preserve
|
Construction Complete in summer of 2019 |
$368K |
$549
|
 |
 |
2015-4
|
4382901 |
Village of Royal Palm Beach
|
Various Royal Palm Beach neighborhoods
|
Upgrade existing sidewalks to ADA standards in residential neighborhoods
|
Anticipated Construction Start: August 19, 2019
|
$839K
|
$1.01M
|
 |
|
2015-5
|
4382911 |
City of Belle Glade
|
Various locations near Gove and Belle Glade Elementary Schools
|
Construct missing sidewalk links
|
FY 2019
|
$1.27M |
$363K
|
 |
|
2015-6
|
4383851 |
City of West Palm Beach
|
Various locations near Palm Beach Neighborhood Schools
|
Upgrade existing sidewalks to ADA standards near schools
|
Anticipated Construction Start: November 2019
|
$879K |
$840K |
 |
|
2014-1 |
4368721 |
City of Delray Beach |
NE 2nd Ave (NE 13th St to NE 22nd St) |
Construct sidewalks, add designated bike lanes, reduce vehicle travel lane widths, install landscaping |
Construction Completed on 2/11/19 |
$1.64M |
$1.82M |
 |
|
2014-2
|
4369301 |
Palm Beach County
|
Australian Ave (9th St to 13th St, Kirk Road), (Forest Hill Blvd to Pot O' Gold St.), and (Military Trail - Dolphin Dr to Old Military Tr)
|
Safe Routes to Schools-Install mast arm school zone flashers
|
Construction started on 1/21/19. Anticipated Completion December 2020
|
$482K
|
$637K
|
 |
|
2014-4
|
4369321 |
City of West Palm Beach
|
North Shore Neighborhood (Residential Streets bounded by 45th St,Congress Ave., Australian Ave and Lake Mangonia)
|
Construct ADA compliant ramps and sidewalks, enhanced crosswalks and signage
|
Anticipated Construction Start: November 2019
|
$573K |
$573K
|
 |
|
2014-5
|
4368741 |
Village of Royal Palm Beach
|
Okeechobee Blvd (Folsom Rd to State Rd 7) and Partridge Lane (Okeechobee Blvd to Sparrow Dr)
|
Install pedestrian-scaled lighting, roadway lighting, and 6 ft wide sidewalk on the east side of Partridge Lane
|
Anticipated Construction Start: January 23 2019
|
$1.54M |
$1.84M
|
 |
|
2013-1
|
4350841 |
City of Lake Worth
|
5th Ave South (A St to F St)
|
Construct 5-block shared use path in unused ROW
|
Construction Completed in 2017
|
$1.16M |
$1.17M
|
 |
 |
2013-2
|
4351461 |
City of West Palm Beach
|
Tamarind Ave (Banyan Blvd to Palm Beach Lakes Blvd)
|
Add landscaping, lighting, and bike sharrows
|
Project Removed, Funded Locally
|
$959K |
$1.15M
|
 |
N/A |
2013-4 |
4350801 |
City of Delray Beach |
NE 2nd Ave (George Bush Blvd to NE 13th St) |
Bike Lane/ Sidewalk |
Construction Completed in 2018
|
$1.27M |
$533K |
 |
 |
2012-1
|
4331691 |
Palm Beach County-Office of Community Revitalization
|
Everglades (E Main St to Canal St in Belle Glade)
|
Construct a pedestrian bridge over the L-10 canal
|
Construction Completed in 2016
|
$759K |
$750K
|
 |
 |
2012-2
|
4331971 |
Village of Royal Palm Beach
|
Sparrow Dr (Sweet Bay Ln to Royal Palm Beach Blvd)
|
Construct a pedestrian bridge over canal
|
Construction Completed in 2016
|
$734K |
$720K
|
 |
|
2012-4
|
4334741 |
City of West Palm Beach
|
Fern St (Flagler Dr to Tamarind Ave)
|
Improve streetscape, add pedestrian amenities, green bicycle lanes, bicycle racks
|
Construction Completed in 2016 |
$898 |
$747K
|
 |
 |
2012-5
|
4331961 |
Village of Wellington
|
Flying Cow Rd. (Binks Pointe to the Wellington Environmental Preserve)
|
Construct 10 ft shared use path
|
Construction Completed in 2017 |
$549K |
$873K
|
 |
 |
2011-1
|
4316521 |
City of West Palm Beach
|
15th St (Australian Ave to N. Dixie Hwy)
|
Add green bicycle lanes, street trees, and enhanced crosswalks
|
Construction Completed in 2015 |
$809K |
$834K
|
 |
 |
2011-2
|
4316501 |
City of Delray Beach
|
NE 2nd Ave (NE 4th St to George Bush Blvd)
|
Lighting
|
Construction Completed in 2015 |
$946K |
$2.05M
|
 |
 |
2011-3
|
4238092 |
Palm Beach County Environmental Resources Management
|
Bluegill Trail (Phase II), Adjacent to Beeline Hwy (PGA Blvd to Northlake Blvd)
|
Construct paved 12 ft shared use path
|
Construction Completed in 2015 |
$977K |
$940K
|
 |
 |
2011-4
|
4316481 |
City of Boca Raton
|
Patch Reef Trail (Along E-3 Canal from S. Verde Trail to south of Town Center Rd)
|
Construct 8 ft wide pathway (Patch Reef Trail)
|
Construction Completed in 2015 |
$362K |
$352K
|
 |
 |
2011-5
|
4276551 |
Village of Royal Palm Beach
|
Crestwood Blvd North (Saratoga Blvd to Royal Palm Beach Blvd)
|
Construct bicycle lanes, landscaping, install a school bus stop
|
Construction Completed in 2013 |
$891 |
$805K
|
 |
 |
2010-1
|
4252592 |
Palm Beach County Environmental Resources Management
|
Jessup Trail (Phase I) (Riverbend Park to the Cypress Creek Natural Area at Martin County line)
|
Construct 10 ft shared use path
|
Construction Completed in 2013 |
$878K |
$619K
|
 |
 |
2010-3
|
4276531 |
Town of Jupiter
|
A1A (Jupiter Rd to Saturn St)
|
Add bicycle lane, sidewalk, landscaping, signage
|
Construction Completed in 2015 |
$7.82M |
$3.84M
|
 |
 |
2010-4
|
4296651 |
City of West Palm Beach
|
Tamarind Ave (Palm Beach Lakes Blvd to 25th St)
|
Landscaping, pedestrian crossing improvements and street furniture
|
Construction Completed in 2017 |
$964K |
$750K
|
 |
 |